3.2.2

Transport inspection and reporting of defects

Upon receipt, immediately inspect the delivery to ensure that it is complete and has not suffered any
damage. If any transport damage is visible, do not accept the delivery, or accept it only with
reservation. Record the scope of the damage on the transport documents/delivery note. Initiate the
complaint process. For all defects that are not discovered upon delivery, be sure to report them as
soon as they are detected, since damage claims must be filed within a certain period, as mandated by
law.
3.2.3

Temperature and humidity

Ambient temperature for
transportation
Humidity
3.2.4

Required tools for unloading and transport

Type
Weight
Fork extension
IV 8034_2.0_EN (01/2017)
-10 °C to 40 °C (-50 °F to 104 °F)
max. 85% (non-condensing)
Unloading the packaged
machine parts
forklift
weight ≥ 1.5 t
approx.
2 m (78.74 inch)
SP2000
Side preparation
Transport the unpacked
machine parts
pallet truck
weight ≤ 1.5 t
approx.
2 m (78.74 inch)
www.troteclaser.com
11 / 30

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SP2000 and is the answer not in the manual?

Table of Contents