Inspection And Assembly Before Use; Inspection Before Installation - Honeywell Miller Soll Xenon Assembly, Installation And Operating Instructions

Anchor device
Table of Contents

Advertisement

2 Inspection and assembly before use

2.1 Inspection before installation

Warning!
must check whether the components on which the Söll Xenon anchor device is to be
stability).
Manufacturer's installation instructions and installation suggestions as per the EN 795 standard and
Australian Standard AS/NZS 1891.4 must be followed at the time of installation. Installation details can
be found in the „Installation Guide" provided separately.
In order to minimise the fall distance and limit the possibility of a free fall, please consider the location
of the anchor device and the work being carried out.
Ensure that the necessary fall clearance for arresting the falling user is not higher than the ground
clearance available on-site. Adjust the type and length of the coupling element accordingly. (For Aust-
ralian & New Zealand please refer to AS/NZS 1891.4.)
(overhead installation, on ground, ...) and the type and length of the coupling element (refer to the
Fig.2.1
6
www.fall-protection.com
H:
Height of the lifeline
f:
NFC: Necessary Fall
Clearance
FD:
Fall distance
1m:
1m safety distance
LL:
Lanyard length
DLAbs: Lanyard energy absor-
ber deployment
t :
user height (Please
consider user height
until his head)
FFD: free fall distance
All these data can be found
either in the user manual of
the equipment concerned or
given by the installer.

Advertisement

Table of Contents
loading

Table of Contents