Changing The Base Circuit Board - Pfaff performance 2054 Service Manual

Service manual
Hide thumbs Also See for performance 2054:
Table of Contents

Advertisement

30. Changing the base circuit board

Note:
The base circuit board is only exchanged as a complete unit.
Removal:
Remove the mains lead from the mains socket and from the machine.
Remove the detachable work support.
Unscrew and remove the three fastening screws on the base plate.
Tilt the base plate to the front.
Remove the connection plug of 12-wire flat cable 4, remove 6-wire flat cable 5 and motor cable 6
from the circuit board (fig. 72).
Fitting:
Set the new base plate complete against the machine.
Mount three connection plugs 4, 5 and 6 on the circuit board.
Fold the base plate against the machine and secure it with the three screws.
After a running-in time of 10 - 15 min. check the adjustment of equal forward and reverse stitch length
in accordance with section 22 of the service manual.
70

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents