General Information; Safety Instructions; Additional Information; Required Parts - Siemens ARCADIS Avantic Installation And Start-Up Manual

Option area dose measurement
Hide thumbs Also See for ARCADIS Avantic:
Table of Contents

Advertisement

4
2-

General information

1Installation and Setting Instructions

Safety instructions

NOTICE

Additional information

These instructions only apply to the retrofitting of the dose meter to an ARCADIS Avantic
system.

Required parts

DAP meter (including 4 threaded bolts)

Required measuring and auxiliary equipment

Dose meter
Crosshair

Required tools

Tool case (see SPC catalog)
ARCADIS Avantic
Installation and Setting Instructions
To avoid light to severe, possibly fatal, injuries and material dam-
age:
The product-specific safety information in the system
manual as well as the safety information in the ARTD,
part 2, must be observed.
After all work has been completed and all covers have
been attached, perform the protective conductor test
according to ARTD-002.731.17. The protective conductor
resistance may not exceed 0.2 Ohms.
Checks and settings that need to be performed under
X-ray radiation are identified by the radiation symbol
x . Radiation protective clothing must be worn while
performing procedures marked with this symbol.
SPR2-330.814.01.01.02
02.05
e.g., PTW-Diados
Page 4 of 10
CS SD 24
0
0
0
0
10 04 76 54
0
97 17 612 Y0388
96 60 051 RE999
0
Siemens AG
Medical Solutions

Advertisement

Table of Contents
loading

Table of Contents