5. Chiller transit

5.1 Checking items after chiller arrival

Check chiller model and quantity, inspect whether there is damage on the appearance.
Chiller injury or parts\document loss caused by client is not in warranty scope.
If client ordered options like spring isolator\flow switches\electric butterfly valve etc., Daikin will put
them in accessory box and deliver together with chiller.
If you requires differential pressure controller configuration, it has been installed on the machine
for you;
Daikin will offer flange or Victaulic groove on evaporator & condenser pipes for customer water
system connection.

5.2 Chiller Lifting

The lifting mode is shown in Fig.5-1. Parameters on nameplate shall be taken as the criteria for
dimensions and weight.

5.3 Lifting Requirements of Chiller

A) It is only allowed to lift with the marked lifting location on the chiller. (Lifting hole as Fig. 5-1
"E")
B) Ensure chiller is horizontal when lifting.
C) It is recommended to use cable or chain to lift the chiller via the lifting holes marked on the
chiller to prevent damage during lifting.
D) In case chiller can't be lifted via the lifting hole. Client might use cable to frap the condenser
and chiller before lifting. But it is forbidden to lift the chiller via compressor or starter lifting lug.
E) Chiller shall be located in horizontal foundation and sufficient space shall be provided on top
for lifting
F)
Certain protection for starter is required during lifting with method D.
SINGLE SCREW CHILLERS IMM
Fig.5-1