Download Print this page

Huawei NetCo 15000-C30 Installation And Commissioning Manual page 27

Advertisement

Commissioning Procedure (1)
Confirm that all AC input switches are turned off;
Tap the Start on the home screen to power on the NetCol5000-C30 k
W;
Choose Settings > System Settings > T/H Sensor on the home screen
and enable the T/H sensors for the corresponding aisles;
Check whether alarms are generated after the NetCol5000-C30 kW ha
s been running for about 3 minutes;
If any alarm is generated, identify the cause and clear the al
arm;
If no alarm is generated, choose Running > Device Details > CW
Valve and query the water inlet and outlet temperature. If the
supply water temperature is greater than the return water temp
erature, check whether the water supply and return pipes are r
eversely connected;
Copyright © 2017 Huawei Technologies Co., Ltd. All rights reserved.
Page 28

Advertisement

loading