Page 1
60cm Thermowell – Instruction Manual 60cm Thermowell – Instruction Manual KL14649 KegLand Distribution PTY LTD www.KegLand.com.au www.KegLand.com.au Last Updated 22/10/2019 1:46 PM Page 1 of 3...
Page 2
If you are using the thermowell for a 27L or 30L FermZilla then use a pipe cutter to cut the thermowell down to 33cm in length. Step 1 – Scoring the metal for a 55L FermZilla Conical or 60L FermZilla All Rounder 1.
Page 3
Step 3 – Assembling the duotight bulkhead fitting 1. Push the thread of the supplied duotight Bulkhead fitting into the hole from the outside of the lid, it should be a tight fit and you may need to rotate the thread as you insert it into the hole.
Need help?
Do you have a question about the KL14649 and is the answer not in the manual?
Questions and answers