Download Print this page

Sun Microsystems Technical Compute Farm Read Me First page 3

Advertisement

Sun Technical Compute Farm
Read Me First
This Read Me First contains important information that became known about your
Sun™ Technical Compute Farm (Sun TCF) system after the manual set was
published. The information is divided into the following topics:
"Hardware Issues" on page 3
"For More Information" on page 25
"Safety Information for the Sun StorEdge Expansion Cabinet" on page 25
"Declaration of Conformity" on page 25
Hardware Issues
This section discusses the following topics:
"New Position of Cisco Networking Devices" on page 3
"Revised Cabling for the Repositioned Cisco Devices" on page 9
"Removing and Replacing the Rack Front and Back Doors" on page 12
"Removing and Replacing the Terminal Server(s)" on page 13
"Removing and Replacing the Ethernet Switches" on page 19
New Position of Cisco Networking Devices
The Cisco C3524 and C3508 Ethernet switches have been repositioned and reversed
in the Sun TCF base and star rack configurations. In both configurations, the C3524
is now mounted below the two terminal server units and faces the rear of the rack.
For the star rack configuration, the C3508 is mounted below the C3524 and faces the
rear of the rack.
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the Technical Compute Farm and is the answer not in the manual?

Subscribe to Our Youtube Channel