3 Installation and Commissioning

3.1
Procedure / steps
Step
1. Install the CP on the S7 standard rail.
2. Establish the connection via the enclosed bus
connector to the backplane bus.
Note
The CP cannot be used in an extension rack that is connected via the IM 365! Reason: The required
communication bus is not connected to the extension rack via the IM 365.
3. Connect the CP to the power supply.
Notes
S
The CPU, CP and IM (if one exists) must be connected to the same power supply.
S
Only wire up the S7-300 / C7-300 with the power switched off!
4. Connect the CP to Industrial Ethernet.
5. The remaining steps in commissioning involve
downloading the configuration data.
CP 343-1 Lean for Industrial Ethernet / Manual Part B
Release 09/2009
C79000-G8976-C198-06
3 Installation and Commissioning
Explanation / meaning
Slots 4 to 11 are permitted for the CP in racks 0 to 3
(connected by IM 360/361).
Proceed as in the sections dealing with setup and
wiring, described in detail in /1/.
Follow the steps as described in detail in /1/ when
wiring between the power supply and the CPU.
To download the configuration, you can connect
the PG as follows:
S
via MPI
S
via Industrial Ethernet
For further details, refer to the general Part A of
this manual:
− addressing the first time (IP address
assignment / node initialization);
− downloading the defined configuration
The PG/PC requires a LAN attachment, for
example via a CP 1613 or CP 1411 and must have
the necessary software (for example the S7-1613
package or SOFTNET IE). The TCP/IP protocol
must be installed. The protocol used must then be
applied to the S7ONLINE access point.
B−13