FLOWBIRD CWT Compact Touch Manual page 99

Table of Contents

Advertisement

Printer mounting · 35
Printer shelf version 1 · 35
Printer shelf version 2 · 35
Sensors · 34
GeBe Printer GTP4672 · 75, 77, 79
Cleaning · 77
Print head · 75
Testing · 79
General · 41
Cabinet · 41
Pedestal · 41
H
Heating system · 49
Heavy lifting · 15
High voltage · 12
Hybrid card reader · 80
Cleaning · 80
Testing · 80
I
Inside the cabinet · 42
Inside the pedestal · 43, 44
Coin Box · 44
COIN BOX Vault · 44
Installation · 57
Installing a modem · 65
Installing the external antenna · 65
Installing the SIM card · 65
Parts needed · 65
Installing the battery · 63
Installing the coin box · 68
Installing the terminal · 62
Introduction · 7
L
LCD display · 15
CWTC S3A · 15
CWTC Touch · 15
Lead battery replacement · 83
List of major changes · 7
Loading paper in a GeBe printer · 67
M
Means of payment · 19
Payment applications · 19
Payment methods · 19
Mechanical design · 41
Mounting the cabinet on top of the pedestal · 63
Mounting the pedestal in its foundation · 62
Issue 13
CWT Compact Touch Installation and Maintenanace Manual
P
Paper refill · 72
Power supply · 49, 50, 51
Battery charging by mains power · 51
Battery charging by solar power · 50
Power control · 49
Preventive maintenance · 73
Print system · 32, 38, 39
Black mark location · 39
GeBe GTP4672 Thermal printer · 32
Paper low sensor area · 38
Preprinting on printer media · 38
Print side · 38
Printer replacement · 84
Product description · 18
Product label · 41
Program loading · 69
R
References · 9
Risk of explosion · 15
Risk of tipping · 16
S
Safety · 12
Caution · 12
Danger · 12
Warning · 12
Short-circuit risk · 14
Site preparations · 57, 58, 59, 60, 61
Minimal site dimensions · 57
Mounting holes · 57
Obstacles and shading · 58
Placing the terminal on an existing concrete
foundation · 59
Pouring a new concrete foundation · 60
Power supply · 61
Solar power Positioning · 58
Solar panel · 82
cleaning · 82
Structure of this book · 8
T
Target audience · 8
Terminal measurements · 55
Terminology · 9
The service menu · 40
Touch Display Module · 88, 90, 91
Assebly of the display unit · 90
Connecting the display to the CPU board · 91
Removing the display unit · 88
Page 99

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CWT Compact Touch and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Related Products for FLOWBIRD CWT Compact Touch

This manual is also suitable for:

Cwtc touch

Table of Contents