FITTINGS AND TUBING
INLET
TESTING THE LOOP
To make sure the installation of EK components was successful, we
recommend you perform a leak test for 24 hours. When your loop
is complete and filled with coolant, connect the pump to a PSU
outside of your system. Do not connect power to any of the other
components. Turn on the PSU and let the pump run continuously.
It is normal for the coolant level to drop during this process as air
collects in the distribution plate. Inspect all parts of the loop, and in
the eventuality, that the coolant leaks, fix the issue and repeat the
testing process. Ensure that all hardware is dry before the system is
powered on to prevent any damage.
OUTLET
STEP 1
STEP 1
Screw in two (2) G1/4 threaded male fittings. Attach the liquid
cooling tubes and connect the water block to the cooling loop.
EK recommends using EK fittings with all EK water blocks.
CAUTION: When using connectors other than EK fittings,
pay special attention to the length of the fittings' male G1/4"
thread – 5 mm is the maximum G1/4" thread length allowed!
- 9 -
Need help?
Do you have a question about the Quantum Scalar2 Direct Link Side Port Terminal - Acetal and is the answer not in the manual?