Functional Tests - Fluke SMFT1000/PRO User Manual

Multifunction pv analyzer
Table of Contents

Advertisement

3. Connect the clamp to the circuit under test.
Tip: Push
to see a connection diagram.
The PV Analyzer automatically detects if the measurement is ac or dc current.
4. Push
to hold the measurement.
The measurement is on hold.
5. Push
to save the results to memory.
A confirmation message with ID number shows on the display and then returns to the test
screen.

Functional Tests

Checklist of functional tests.
To test:
1. Turn the rotary switch on the PV Analyzer to FUNC./P
2. Push
to start to record the results of the functional tests.
3. Use
to highlight the different checklist items.
4. Push
and
5. Push
(Back) to return to the Power test.
If any check boxes are filled in, then
clear for a new session regardless of power on/off or different day.
6. Push
to save the results to memory.
A confirmation message with ID number shows on the display and then returns to the test
screen.
to select pass, fail, or N/A for the highlighted row.
AC/DC
is available. All results show on the display until you
Multifunction PV Analyzer
.
Test Setup
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smft-1000

Table of Contents