SMA SUNNY BOY 240 Instruction Manual page 44

Table of Contents

Advertisement

7 Commissioning
Procedure:
• Switch on the circuit breaker.
☑ Both LEDs on the Sunny Multigate are glowing green. Feed-in operation begins.
✖ The LED Inverter is off?
There is a disturbance in the PV system.
• You will find the detailed error message in Sunny Portal or Sunny Explorer. You can find
the cause and its corrective measure in this document (see Section 11.1 "Events:
Information, Warnings and Errors", page 52).
✖ The LED Inverter on the Sunny Multigate is glowing orange or red?
There is a disturbance in at least one of the connected inverters.
• You will find the detailed error message in Sunny Portal or Sunny Explorer. You can find
the cause and its corrective measure in this document (see Section 11.1 "Events:
Information, Warnings and Errors", page 52).
✖ The LED Multigate on the Sunny Multigate is glowing orange or red?
There is a disturbance in the Sunny Multigate.
• Identify and eliminate the disturbance (see Section 11.1 "LED Signals on the Sunny
Multigate", page 52).
44
SMG-SB240-IA-en-11
SMA Solar Technology AG
Installation Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny multigateSb 240-10Multigate-10

Table of Contents