SMA SUNNY BOY 240 Instruction Manual page 14

Table of Contents

Advertisement

3 Scope of Delivery
Item
A
B
C
D
E
* Last inverter: The inverter that is located at the end of the PV system and not directly connected to the Sunny Multigate but only
to one other inverter, is called the "last inverter" in this document. An AC pin connector remains unused on the last inverter and must
be closed with a protective cap.
** Keep this label with your access data for registration in Sunny Portal. The access data can be found on the Sunny Multigate
type label.
AC Cable and DC Plug
Figure 3:
Components included in the scope of delivery of the AC cable and the DC plug
Item
A
B
* First inverter: The inverter that is located at the beginning of the PV system and is directly connected to the Sunny Multigate via
the AC cable is called "first inverter" in this document.
** The DC connectors illustrated may deviate from your order.
14
SMG-SB240-IA-en-11
Quantity
Designation
1
Sunny Multigate
1
AC field plug: insulator, plug enclosure, seal,
screw connection
1
Protective cap for unused AC pin connector on the last
inverter
1
Label with registration ID (RID) and identification key (PIC)
for registration in Sunny Portal
1
Installation manual for Sunny Boy and Sunny Multigate,
mounting overview, supplementary sheet with default
settings
Quantity
Designation
1
AC cable with two connectors for connecting two inverters
or for connecting the first inverter
1
DC plug with two DC connectors
*
SMA Solar Technology AG
**
*
with the AC field plug
**
Installation Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny multigateSb 240-10Multigate-10

Table of Contents