Commissioning The Ifp - Siemens SIMATIC V2 Operating Instructions Manual

Industrial flat panels
Table of Contents

Advertisement

Commissioning the IFP

When you operate the IFP exclusively as monitor and do not change the brightness, you do
not need to commission the device. To use extended functions, perform the following
commissioning.
Requirement
• The IFP is mounted according to the documentation.
• The IFP is connected according to the documentation and connected to a PC for
commissioning.
Procedure
1. Switch on the PC.
2. Power on the IFP.
3. Download the software PDT (Panel Driver Tool) on the internet
(https://support.industry.siemens.com/cs/ww/en/view/109792891).
4. Launch the "start.exe".
5. Follow the instructions for installation.
IFP V2, IFP V2 PRO, IFP V2 ETH
Operating Instructions, 03/2023, A5E46641410-AE
4
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic ifp v2Simatic ifp v2 proSimatic ifp v2 eth

Table of Contents