Models Included:
CAUTION:
must be installed to
comply with applicable
federal, state, and local plumbing/
electrical codes having jurisdiction.
CAUTION: Follow this
setup procedure before
attempting to use this
unit. Failure to follow these instruc-
tions can result in injury and/or void
of warranty.
CAUTION: DO NOT
connect the unit to hot
water. The inlet valve is
not rated for hot water.
IMPORTANT:
After setup, run a FULL
brewcycle. Place a tea
container to catch both hot water
from the brewcone and dilution water
from spout on the front cover.
WARNING HOT LIQUID,
Scalding may occur.
Avoid splashing.
ISO 9001:2008 REGISTERED
WILBUR CURTIS CO.
Montebello, CA 90640
For the latest information go to
www.wilburcurtis.com
Tel: 800/421-6150
W
Service Manual – TCT & PTT
Important Safeguards/Symbols
This appliance is designed for commercial use. Any servicing other than cleaning and preventive maintenance should be performed by an
Symbols
WARNINGS – To help avoid personal injury
Important Notes/Cautions – from the factory
Sanitation Requirements
The Curtis G3 Brewer is Factory Pre-Set and Ready to Go... Right from the Box.
Following are the Factory Settings for the G3 Iced Tea Brewer.
Generally there will never be a reason to change the G3/Gold Cup Series default settings. However, should you need to make slight
adjustments to meet your brewing needs, programming instructions are provided later in this manual.
System Requirements:
SETUP STEPS
the brewer.
NSF International requires the following water connection:
cleaning underneath.
installed and maintained in accordance with federal, state, and local codes.
caused by an empty tank.
readout.
5. Important: Run one full brewcycle, to purge the water lines and valves of air. Five seconds of dilution water at the beginning of each
brewcycle is normal pre-programmed operating behavior.
BREWING INSTRUCTIONS
Pour leaf tea into basket.
C
C
ilbur
urtis
ompany
3. Slide brew cone into brew
rails. Place tea container
under brew cone.
, i
.
nC
brew tea.
1