Figure 2-1. Evm Connection For Basic Operation - Texas Instruments BQ77216 User Manual

Evaluation module
Table of Contents

Advertisement

www.ti.com
2. Connect a 0-V DC power supply capable of 250 mA minimum between the "BAT-" and "BAT+" terminals and
adjust to approximately 45 V.
3. Connect a meter to a VSS test point and monitor the COUT or DOUT test points, or the corresponding
signals at J4 terminals 4 or 5.
4. Observe that both the COUT (J4 pin 4) and DOUT (J4 pin 5) are low, approximately 0 V.
5. Remove the cell simulator shunt for cell 2, J6 pins 17 and 18.
6. Observe the COUT and DOUT signals are low.
7. Install the cell 2 cell simulator shunt at J6 pins 17 and 18.
8. Adjust the supply voltage to approximately 71 V. Observe the COUT transitions to approximately 7 V after 4
seconds. Confirm DOUT remains low if desired.
9. Adjust the supply voltage to approximately 31 V. Observe DOUT is approximately 7 V after 4 seconds as the
part transitions to UV mode. Observe COUT is low if desired.
10.Make other adjustments as desired for evaluation. See other sections of this user guide for details of
operation.
11. When complete with this quick start demonstration, turn off the power supply.
Refer to other sections of this user guide for additional details.
DC Power Supply
+ -
SLUUC95A – AUGUST 2020 – REVISED NOVEMBER 2020
Submit Document Feedback

Figure 2-1. EVM Connection for Basic Operation

Copyright © 2020 Texas Instruments Incorporated
BQ77216 EVM Getting Started Guide
Connect as
needed for
evaluation
DMM
+ -
BQ77216 Evaluation Module
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bq77216evm

Table of Contents