Installing The Serial Port Cable - HP ProLiant ML30 Gen10 User Manual

Table of Contents

Advertisement

Installing the serial port cable

Installing the serial port cable
Prerequisites
Prerequisites
Before you perform this procedure, make sure that:
The M.2 SSD/dedicated iLO/serial port enablement board is installed .
5 mm hex nut screwdriver is available.
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode: Position the tower server for hardware configuration.
If the server is in rack mode: Remove the server from the rack .
5. Remove the front bezel .
6. Remove the access panel .
7. If installed, remove the air baffle .
8. Remove the serial port blank.
9. Install the serial port.
Installing the serial port cable
113

Advertisement

Table of Contents
loading

Table of Contents