Installing an SFF hot-plug drive
Installing an SFF hot-plug drive
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are populated
CAUTION:
with either a component or a blank.
Procedure
Procedure
1. Remove the front bezel .
2. Remove the drive blank.
3. Prepare the drive.
4. Install the SFF drive.
5. If the drive is installed in an empty drive cage after the initial system boot, reboot the system to maintain optimal ventilation.
6. Determine the status of the drive from the drive LED definitions .
7. Install the front bezel .
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise website
Hewlett Packard Enterprise website .
Installing an SFF hot-plug drive
90