Trane S9V2B040U3VSAE Installation, Operation And Maintenance Manual page 76

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2-stage condensing variable speed furnaces with variable speed draft inducer, upflow, convertible to horizontal right or horizontal left/downflow only
Table of Contents

Advertisement

F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
7. Remove plug from 3" hole.
8. Install condensate trap grommet.
9. Remove the pressure switch bracket assembly.
10. Remove the screw that holds PS2, rotate 90 degrees
clockwise, and reattach.
11. Reattach the pressure switch bracket assembly.
76
12. Attach the vent outlet gasket to the vent outlet.
13. Install vent outlet to top of cabinet using 2 screws
supplied in the doc pack.
14. Install vent inlet gasket and vent inlet using 4
screws supplied in the doc pack.
S9V2-VS-SVX001-1B-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents