Special Case Venting - Trane S9V2B040U3VSAE Installation, Operation And Maintenance Manual

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2-stage condensing variable speed furnaces with variable speed draft inducer, upflow, convertible to horizontal right or horizontal left/downflow only
Table of Contents

Advertisement

Special Case Venting

Special instructions for direct vent furnace air intake.
In certain applications, particularly when the furnace is located in a
basement, there are certain conditions that can be met where warm
humid air from the outside is drawn into combustion air piping. If the
area where the piping is located is conditioned below 70° F,
condensation could occur inside the piping and ultimately drain into
the furnace compartment, which could lead to premature component
failure.
We recommend following one of the options to prevent this condition
from occurring and possibly damaging components within the
furnace:
Option 1
If possible, slope the inlet combustion air piping away from the
furnace. Condensation that may occur will now drain outside of the
home. The combustion air outlet piping must remain sloped back to
the furnace.
Option 1
Combustion air
exhaust
Combustion air
intake
Slope equals 1/4" per foot
Primary drain vent stack must
terminate below the bottom of
the condensate trap
To an approved
vented drain
Option 2 – Top combustion air intake
If sloping the combustion air intake pipe is not possible, install a DWV
Tee as close to the furnace as possible with drain and trap to prevent
condensation from occurring in the furnace cabinet. Do not tee AC
condensate and combustion air condensate trap together.
Option 2
Combustion air
exhaust
Combustion air
intake
Approved DWV Tee
Field fabricated trap
Primary drain vent stack must
terminate below the bottom of
the condensate trap
To an approved
vented drain
S9V2-VS-SVX001-1B-EN
F F u u r r n n a a c c e e G G e e n n e e r r a a l l I I n n s s t t a a l l l l a a t t i i o o n n
Note: Inlet air piping is not considered to be part of the venting
system. The inlet air piping may be made from PVC.
Optional In-line Condenser Trap Kit
The BAYCNDTRAP2 and BAYCNDTRAP3 may be used for Option 1
venting. The in-line condenser trap kit must be installed on the
vertical section of the combustion air intake pipe.
Note: The in-line condenser trap may only be installed one way. See
the imprint on the trap to ensure the arrow is pointing towards
the furnace.
The BAYCNDTRAP2 is used when the system uses 2" vent pipe.
The BAYCNDTRAP3 is used when the system uses 3" vent pipe.
Combustion air
exhaust
Combustion air
intake
BAYCNDTRAP2
BAYCNDTRAP3
Field fabricated trap
Primary drain vent stack must
terminate below the bottom of
the condensate trap
To an approved
vented drain
Option 3 – Side combustion air intake
If sloping the combustion air intake pipe is not possible, install an
approved DWV Tee as close to the furnace as possible with drain and
trap.
Option 3
Combustion air
intake
Approved DWV Tee
Field fabricated trap
Primary drain vent stack must
terminate below the bottom of
the condensate trap
To an approved
vented drain
Combustion air
exhaust
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents