Download Print this page

Rotax S115 Operator's Manual page 57

Advertisement

the
powerhead
completely.
8. Remove the garden hose from the
flushing port.
9. Install the cap onto the flushing
port.
10. Close the access hatch cover.
11. Reinstall propeller.
F F l l u u s s h h i i n n g g — — O O u u t t b b o o a a r r d d N N o o t t R R u u n n n n i i n n g g
1. Open
the
hatch cover (location may differs
depending on the boat model).
2. Place
outboard
(DOWN) position.
3. Remove the cap from the flushing
port.
4. Thread the garden hose onto the
flushing port.
5. Turn water supply on.
6. Flush outboard for at least five
minutes.
7. Turn off water supply.
8. Leave the outboard in VERTICAL
(DOWN) position long enough for
the
powerhead
completely.
9. Remove the garden hose from the
flushing port.
10. Install the cap onto the flushing
port.
11. Close the access hatch cover.
to
appropriate
access
in
VERTICAL
to
drain
drain
MAINTENANCE PROCEDURES
55

Advertisement

loading

This manual is also suitable for:

S150S115hxfS150xf