Installation Planning; Installation Steps; Step 1-Mount The Radios - GE MDS entraNET Series Startup Manual

900 mhz and 2400 mhz extended range ip networking transceivers
Table of Contents

Advertisement

The entraNET transceivers are capable of dealing with many common
security issues.
provide a solution for minimizing vulnerability.
Table 1. entraNET Cyber Security Highlights
Security Level
• MDS Cyber Security
Suite, Level 3:

INSTALLATION PLANNING

It is highly recommended that the Access Point unit be installed first.
With this plan, you can quickly check the operation of each associated
Remote as it is placed on the air.
Should further information be needed,
TANCE" on Page 28
MDS Technical Services Group. You will also find support informa-
tion at the GE MDS Web site: www.GEmds.com.

INSTALLATION STEPS

There are three main requirements for installing the transceiver. They
are: adequate and stable DC power, a good antenna system, and the
correct interface between the transceiver and the data device.
Step 1—Mount the Radios
Figure 1
shows the dimensions of the AP transceiver with mounting
brackets attached.
ceiver. When mounting entraNET transceivers, choose a location that
provides easy access to the connectors on the end of the radio and an
unobstructed view of the LED status indicators.
05-4565A01, Rev. A
Table 1
profiles security risks and how the transceivers
Specification
• RC4-128 encryption
• Automatic rotating key algorithm
• Approved AP/Remotes list (local authentication)
• Failed login lockdown
• 900 MHz operation and proprietary data framing
of this guide for information on contacting the
Figure 2
shows the same view for a Remote trans-
MDS entraNET Start-Up Guide
see "TECHNICAL ASSIS-
5

Advertisement

Table of Contents
loading

Table of Contents