Step 1: Attach the bracket using
the two screws provided. (Attach
to the end opposite the connectors.)
Figure 3. DIN Rail Mounting Details for MDS Equipment
Step 2—Install the Antenna
To minimize radio frequency interference, the antenna should be
mounted at least nine inches (> 23 cm) from the connected device(s),
sensors and other components of the system.
Step 3—Measure & Connect DC Power
The power applied to transceivers (AP and Remotes) must be within
6–30 Vdc and be capable of continuously providing a minimum of 11
Watts. (Typical power consumption is 800 mA at 13.8 Vdc for the AP
and 600 mA at 13.8 Vdc for Remotes.)
A power connector with screw terminals is provided with each radio.
Strip the wire leads to 6 mm (0.25"). Be sure to observe proper
polarity, as shown in
It takes approximately 30 seconds for the AP transceiver to
NOTE:
power up and be ready for operation. The Remote requires
approximately five seconds to power up.
05-4565A01, Rev. A
Figure
4, with the positive lead ( + ) on the left.
MDS entraNET Start-Up Guide
Invisible place holder
Step 2: Snap the assembly onto
the DIN rail. To remove the radio,
pull down on the release tab.