Storage waiting for installation

Waiting for the installation, the components of the unit and the relative documents must be stored
4
in an area that:
• is dedicated exclusively to the storage of the units;
• is protected from the weather (preferably prepare a closed area), with adequate temperature and humidity.
• Is accessible only to operators tasked with the assembly.
• Can support the weight of the equipment (check the load rating) and has a stable floor.
• is free from other components, especially if they are potentially explosive/incendiary/toxic.
If you cannot proceed with the installation straight away:
• check periodically that the above-mentioned conditions about the storage area are guaranteed;
• cover the unit with a sheet;
• always provide an insulating base (e.g., wood blocks) between the floor and the unit itself.
4
Correct storage awaiting installation
Any movement carried out after unpacking must be done with the doors closed. Do not move
the units by pulling on the doors, if present, the uprights or other protruding parts that are not
an integral part of the structure.
Do not step on the units!