Miele PIB 100 Operating Instructions Manual page 53

Commercial steam ironing system
Table of Contents

Advertisement

 Fit water container
 Put the water container back into the
tower.
After about 10 minutes (the time it takes
for the descaling tablets to dissolve),
the descaling process begins automat-
ically. Messages in the display will tell
you when to empty the residual water
drawer or when to fill the water con-
tainer.
If the water container becomes
empty during descaling or if it is re-
moved from the tower unprompted,
the message  
will appear.
tainer
During the descaling process, water is
pumped into the steam generator at
various times and is drained back
again into the residual water drawer.
Some steam will escape and splash-
ing noises can be heard during this
process.
Fit or refill water con-
Cleaning and care
 Empty drawer
This message may be displayed after
inserting the water container with the
descaling tablet. If you do not see this
message, you can skip the following
steps and continue as soon as you
see 
 
Pre-rinse
in the display.
 Set the steam ironing system to its
highest working position in order to
remove the residual water drawer
(see "Height adjustment").
 Remove the residual water drawer
from the tower.
The residual water drawer may still
be warm after the rinsing process.
 Empty the residual water drawer.
As long as the residual water drawer is
not inserted into the tower, the display
will show the following message  
drawer
.
 Fit drawer
 Slide the residual water drawer back
into the tower until it clicks into place.
Fit
53

Advertisement

Table of Contents
loading

Table of Contents