Fixing Installation Panel - Beko BRAE 090 User Manual

Table of Contents

Advertisement

Available languages

Available languages

7
Installation manual
Indoor unit
Outdoor unit
Tubing size (mm/inch)
Liquid tube
Gas tube
Ø 6 (1/4")
Ø 9.52 (3/8")
Ø 6 (1/4")
Ø 12 (1/2")
Ø 6 (1/4")
Ø 15.88 (5/8")
Ø 9.52 (3/8")
Ø 15.88 (5/8")
Ø 9.52 (3/8")
Ø 19.05 (3/4")
The above dimensions are for reference only the
actual product shall prevail"
7.6

Fixing installation panel

• Dismantle the metal installation board of the
indoor unit. Adjust the mounting panel to
horizontal position.
• Drill holes and insert plastic expansion tubes
at the appropriate locations on the wall and
fix the installation board on the wall with
M5 x 30 screws and washer 6. Ensure that
there must be at least 4 fixed points in the
wall. Ensure installation board to horizontal
position.
Split Type Air Conditioner / User Manual
Height
difference
Indoor unit
Fig. 3
Standard tubing
Max tubing
Length (m)
Length (m)
5.0
9
5.0
12
5.0
15
5.0
15
5.0
20
• Drill holes as Fig. 4 shows. The hole, 80 mm in
diameter, should slightly slide down outwards.
• Cut PVC tubes at a slight angle in the length
shorter than wall thickness and inset it into the
hole. (Fig. 5)
• Mount the wall cap.
Outdoor unit
oil trap
Height
Additional
Difference (m)
refrigerants
(g/.m)
5
12
7
12
8
12
8
15
10
15
31 / 46 EN

Advertisement

Table of Contents
loading

Table of Contents