Figure 2-1. Lifting of unpacked machines.
NOTE:
The machine must be lifted from its frame. Do not attempt to lift the machine
from the top cover!
Do not lift the complete generating set by the generator lifting points.
When moving the generator always keep it in the horizontal plane, this will
reduce the risk of the rotor falling out if 1-bearing design considered.

2.1.4 Checks upon arrival and unpacking

Check upon arrival
Inspect the machine and the package immediately upon arrival. Any transport
damage must be photographed and reported immediately, i.e. within less than one
(1) week after arrival, if the transport insurance is to be claimed. It is therefore
important, that evidence of careless handling is checked and reported immediately
to
Annex 5. Commissioning Report.
A machine that is not installed immediately upon arrival must not be left without
supervision or without protective precautions. For more details, see
Chapter 2.2. Storage.
the
transport
company
Page 14
and
the
supplier.
Use
checklists
in

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amg 0500

Table of Contents