Checking After Installation - Ruijie Reyee RG-RAP2200 Hardware Installation And Reference Manual

Hide thumbs Also See for Reyee RG-RAP2200:
Table of Contents

Advertisement

Hardware Installation and Reference Guide
1.
Bundle the drop UTP/STP cables and route them to the LAN1/PoE port.
2.
Attach the cables in the cable tray of the rack.
3.
Extend the cables under the AP and run in a straight line.

3.8 Checking after Installation

Checking the Cabinet
Make sure the external power supply matches the patch panel specifications for the cabinet.
After installation, make sure that the front and rear cabinet doors easily close.
Make sure the cabinet is stable and level.
Make sure the device and all cables are securely fastened in the rack.
Checking Cable Connection
Make sure the UTP/STP cable matches the interface type.
Make sure cables are properly bundled.
Checking the Power Supply
Make sure all power cables are properly connected and safe.
Make sure the AP is operational after powering on.
12
Installing the Access Point

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Reyee RG-RAP2200 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Reyee rg-rap2200f

Table of Contents