Hamworthy STRATTON MK3 Series Installation, Commissioning And Servicing Instructions page 36

Table of Contents

Advertisement

STRATTON MK3 - Installation, Use and Maintenance
1
Gas valve
00U07446410-A
4.5.2.
Changing the ignition, pre-ventilation, minimum and maximum speeds
36 / 154
Screw (x4)
Figure 11 - Installing the propane injector
Place the boiler in standby mode (see § 3.3.1 of the NAVISTEM B3100 boiler
command table instructions).
If necessary, press the ESC button to return to the main screen.
Open the menu Settings / Safety unit.
Adjust the pre-ventilation speed (9504), ignition speed (9512), minimum
speed (9524) and maximum speed (9529) settings:
Models
Gas
G20
40
G31
G20
60
G31
G20
70
G31
G20
80
G31
G20
100
G31
G20
120
G31
Nut
9504
4090
4090
4220
4220
4930
4930
3100
3100
3100
3100
2900
2900
Crank flange
screw (x4)
Propane Injector
STRATTON MK3
ø
70 :
6.4
STRATTON MK3
ø
80 / 100 :
6.8
STRATTON MK3
ø
120 :
7.4
9512
9524
2430
2430
3910
2350
3280
2500
3610
2400
3160
2540
3260
2400
1930
1930
1870
1870
1930
1930
1870
1870
2120
2070
2360
2000
00U07428680-C
9529
8740
8340
9500
9100
9500
9000
5500
5500
6450
6450
7400
7200

Advertisement

Table of Contents
loading

This manual is also suitable for:

S3-40S3-60S3-70S3-80S3-100S3-120 ... Show all

Table of Contents