Fleet series floor standing, condensing , room sealed, fully modulating, pre-mix, gas fired boilers for heating & domestic hot water installations (68 pages)
Upton series.
floor standing, condensing , open flue,
fully modulating, pre-mix,
gas fired boilers for heating & domestic
hot water installations (64 pages)
Wessex 100 m series boilers, high efficiency, high/low, pre-mix, gas fired, modular boilers for heating and domestic hot water installations, natural gas i2h, lpg-prorane i3p (40 pages)
Condensing fully modulating, pre-mix, gas fired, modular boilers for heating and domestic hot water installations, natural gas i2h, lpg propane i3p (68 pages)
Gas fired modular boiler systems atmospheric cast iron boiler 40kw to 120kw output permanent ignition controls standard draught diverter or low line draught diverter (42 pages)
Summary of Contents for Hamworthy S150
Page 1
Shaftesbury Slimline Gas/Oil Fired Cast Iron Sectional Boilers 150kW to 290kW Installation, Commissioning and Servicing Instructions NATURAL GAS CLASS D (35 sec fuel oil) IMPORTANT NOTE THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING, COMMISSIONING, OPERATING OR SERVICING EQUIPMENT...
Page 2
01202 662555 Hamworthy offer a service of site assembly for many of our products in instances where plant room area is restricted. Using our trained staff we offer a higher quality of build and assurance of a boiler built and tested by the manufacturer.
Page 3
FOUND RELATING TO SPECIFIC FUEL TO BE FIRED BEFORE FIRING BOILER. THIS BOILER COMPLIES WITH ALL RELEVANT EUROPEAN DIRECTIVES. EC TYPE CERTIFICATE No. E0113/5074 PRODUCT IDENTIFICATION No. 461AS113 PUBLICATION NO. 500001129 ISSUE ‘A’ OCTOBER 2004 HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
BOILER ASSEMBLY ........................8 Assembly of Heat Exchanger Fitting of Boiler Insulation Assembly of Boiler Casing Electrical Supply Filling the System COMMISSIONING ........................... 22 REPLACEMENT OF PARTS ......................23 APPENDIX ‘A’ – TECHNICAL DATA ........................26 HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Portland and Weymouth pressurisation units are (temperature gauge) available from Hamworthy Heating Ltd for sealed A flying lead and plug to connect to the burner systems. An additional thermostat, boiler run lamp, hours run meter and flying lead/plug for high/ Shaftesbury Slimline sectional boilers can be low burners.
Gas Supply Pipes should be suitable for an upstream pressure of 50mbar max. for Natural Gas. • Boiler house gas isolation valve must be clearly identified and installed close to the entrance / exit. HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
It is forbidden for the boilers to operate unless fitted with a circulating pump. • Circulating pumps must be selected to ensure a temperature differential of between 5 C and 35 Safety Valve & Manometer Valve Circulating Pump Valve Expansion Tank Figure 4.4 - Water Connections HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Time clock control should be via the boiler modules stop/start circuit (230v). ADDITIONAL INFORMATION REGARDING ELECTRICAL SUPPLIES IS GIVEN IN BS EN60335, Part 1. NOTE: The appliance must be isolated from the electrical supply if electric arc welding is carried out on connecting pipework. HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
5.1.2. Select upper and lower rear nipples and apply a coating of paste as indicated above. 5.1.3. Loosely locate nipple into position in housing 5.1.4. Using a 2 kg hammer gently tap the nipple into as shown above. position. HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 15
5.1.6. Using a 2 kg hammer tap the intermediate section into place. 5.1.7. Prepare the mating edges of the intermediate section with mastic and fit ceramic rope as shown. HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 16
NOTE: Ensure that the number stamped in top right hand corner of casting faces towards the front of the boiler. 5.1.12. Once all sections are in place, attach mounting bars to top and bottom as indicated and tighten. HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 17
5.1.15. Fit top and bottom flanged nipples with the bolts and washers supplied. NOTE: Ensure that gasket is fitted before attaching flange to casting. HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 18
5.1.18. Select divider plates and stoppers, fitting as shown. Fit as follows: S150 2 off small dividers, 2 off large dividers, 2 off stoppers. S190 2 off small dividers, 2 off large dividers, 2 off stoppers.
Page 19
Secure insulation to body with straps supplied (marked A below) in figure 5.2.1 Figure 5.2.1 5.2.2. Insulation securing tapes should be secured as shown in figure 5.2.2 Pull Pull Figure 5.2.2 HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 21
2 off M16 nuts and washers. 5.3.8 Position the upper rear guide support (item 7) on the rear casting, ensuring the folds face inwards towards the front of the boiler, and secure with 2 off M16 nuts and washers. HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 22
5.3.16 Position the left hand upper guide on the upper rear support and secure using screw supplied (item 15). NOTE: At this stage, once all rails are fitted, tighten all fixings. HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 23
(item 18). NOTE: S150 & S190 Models do not have intermediate panels. 5.3.21 Select the right and left front side panels (item 20) and, as in previous 2 steps, slide into place along guide rails, securing with M8 nut and washer supplied (item 21).
Page 24
5.3.29 Place 2 off 24mm dia. grommets in positions marked 32. 5.3.30 Tighten M16 Nuts (item 34) 5.3.31 Position control panel over M10 x 35 studs at front of boiler and secure with M10 nuts supplied (item 36) HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 25
5.3.35 Assemble the 2 off intermediate stiffeners into the top panel using the screws supplied (item 41). 5.3.36 Fit 8 off centring studs (item 42) using the M4 nuts supplied. 5.3.37 On completion, the top cover should look like this. HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
These deposits lead to thermal and mechanical constraints, which may go as far as resulting in the cracking of the cast iron sections of the boiler. 5.4.2 Volt Free Contacts Diagram HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Ensure that ventilation and air supply to plant room is correct. 6.3 Pipework, Valves and Pump Ensure that; • Pipework and valve arrangement is installed to Hamworthy Heating recommendations. • Circulating system is full of water, vented and pressurised appropriately. •...
Page 33
NU-WAY B45 A2 T1S RIELLO RL28 S290 HI/LO NU-WAY B45 A2 T1S NOTE! Heat input values quoted above are based on class D Fuel Oil with a net CV of 35.47 MJ/litre @ 15 HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 34
4.0 x 60° S270 HI/LO 532904041 6.5 x 60° 532904075 3.75 x 60° 532904028 2.25 x 60° S290 HI/LO 532904041 6.5 x 60° 532904032 4.0 x 60° 532904029 2.5 x 60° NOTES INSTALLER SITE ADDRESS HAMWORTHY HEATING LTD SHAFTESBURY SLIMLINE 500001129/A...
Page 36
Unit 2, Antrim Line Business Park, Sentry Lane, Newtownabbey BT36 8XX tel: 02890 849826 fax: 02890 847443 Website www.hamworthy-heating.com Associate Companies, Offices and Agents throughout the World. Hamworthy reserves the right to make changes and improvements which may necessitate alteration to the specification without prior notice.