Komatsu D32E-1 Shop Manual page 119

Crawler tractor
Hide thumbs Also See for D32E-1:
Table of Contents

Advertisement

REASSEMBLY
Legend for Exploded and Cross Section Views
1. Hub Gasket
2. Ground Sleeve Hub
3. Ball Bearing
4. Pump Gear
5. Seal Ring
6. Retaining Ring
7. Retaining Ring
8. Rear Housing
9. Retainer Hub
10. Hub Gasket
REMARK
Callouts from exploded and cross section views correspond with
callouts in following steps.
1. Install aligning studs, DR04-717 into retainer hub. Position
gasket (10) over studs aligning holes.
2. Install ground sleeve hub (2) over studs against retainer hub (9).
Position assembly in controlled freezer at -40EC (-40EF) for 4
hours or pack in dry ice for 4 hours.
3. Position rear housing (8) in press. Position hub gasket (1) in
housing aligning holes.
4. Remove assembly from freezer and aligning studs with holes,
press and bottom in rear housing.
TORQUE CONVERTER
7B - 25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents