Power Connection; Installing A Power Supply Module In A 5600 Series Switch - Nortel BayStack 5520-48T-PWR Install Manual

Ers 5000 series ethernet routing switch
Hide thumbs Also See for BayStack 5520-48T-PWR:
Table of Contents

Advertisement

Power connection

These procedures describe the steps to connect power sources to the
switches.

Installing a power supply module in a 5600 Series switch

This procedure describes the step necessary to install a power supply
module in a 5600 Series switch.
Prerequisites
#2 Phillips screwdriver
Procedure Steps
Step
1
2
3
4
Copyright © 2008–2009 Nortel Networks
CAUTION
To prevent damage from electrostatic discharge, always
wear an antistatic wrist strap connected to an ESD jack when
performing maintenance on a 5000 Series switch. Ensure that
the wrist strap makes contact with your skin.
Action
Use a Phillips screwdriver to loosen the two screws that secure
the metal plate that covers the slot in which you want to install
the power supply module.
Remove the cover plate.
Insert the power supply module in the power supply slot. The
following figure shows the power supply module inserted in a
5600 Series switch.
Push the power supply module gently, but firmly, to insert it fully
into the internal connection port. When the power supply is fully
inserted, the front of the power supply unit is flush with the rear
panel of the switch.
ERS 5000 Series Installation
NN47200-300 04.03
13 April 2009
Power connection 73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents