Checklist

8 Checklist
We recommend that you work through the checklist during commissioning and when replacing the
measuring system and store it as part of the overall system documentation.
Documentation basis
Sub-item
Check that the measuring system
can be used for the present
automation task on the basis of the
specified safety requirements
Fulfilment of the installation
requirements
Voltage supply requirement
Correct electrical installation
(shielding)
System test after commissioning
and modifications
Device replacement
Operating Manual PSEN enc sincos/HTL
1005022-EN-01
To note
Intended use
Safety functions of the fail-safe
evaluation device
Compliance with all technical data
Connection of the measuring system
- shaft to the drive must be designed
as form closure
The coupling to the drive must be
over-dimensioned in accordance with
DIN EN 61800-5-2
The power supply used must meet
the requirements of SELV/PELV
(IEC 60364-4-41)
Observance of basic rules for
installation
Observance of wiring standards
During commissioning and after any
modifications all affected safety
functions must be checked
It must be ensured that the new
device corresponds to the replaced
device
All affected safety functions must be
checked
Date
Edited
Can be found under
Intended use
Safety functions of the fail safe
evaluation device
Technical Data
Mounting
Electrical characteristics
EMC requirements
Installation / Preparation for
Commissioning
Safety functions of the fail-safe
evaluation device
Safety functions of the fail-safe
evaluation device
Checked
yes