Permitted Cable Length; Pin Assignment; Psen Enc Sin/Cos - Pilz PSEN enc sincos/HTL Operating Manual

Table of Contents

Advertisement

Installation / Preparation for Commissioning

6.6 Permitted cable length

The permissible cable length at the transmission of incremental signals depends on the
output frequency, the applied supply voltage and the ambient temperature of the
measuring system. With Pilz cables up to 30 m, no restrictions are to be taken into
account with regard to the output frequency, the supply voltage and the ambient
temperature. When longer cables are used, there may be restrictions.

6.7 Pin assignment

6.7.1 PSEN enc SIN/COS

Pin
Assignment
1
A
2
/A
3
not connected
4
B
5
/B
6
not connected
7
Z
8
/Z
9
not connected
10
not connected
11
UB
12
GND
WARNING!
Short-circuits, voltage peaks, etc. can cause operating failures and
uncontrolled operating states, as well as serious personal injuries and
damage to property.
De-energize the system before carrying out wiring work or opening and closing
electrical connections!
Operating Manual PSEN enc sincos/HTL
1005022-EN-01
Description
Track A
A
Track
inverted
Track B
Track B inverted
Track Z
Track Z inverted
Supply voltage
Ground
Level
Driver
Sinus 1Vss
Sinus 1Vss
Sinus 1Vss
Sinus 1Vss
Sinus 1Vss
Sinus 1Vss
10 - 30 V
0 V
NC
Colour
white
brown
yellow
gray
blue
red
gray/pink
red/blue
Seite 30 von 38