36 Installation checklist
4.
Internal cabling to integrated transformer (power, auxiliary, control and
heater cables) made according to the instructions in this manual
(Electrical
installation)
5.
Cable entry made according to the instructions in this manual (
installation)
6.
All control cable screens and conductors are connected according to the
instructions in this manual
and the customer-side connections are completed
7.
Heating cable (if supplied) installed according to the instructions in this
manual
(Electrical
8.
Ground cable of drive securely connected at both ends
9.
Input and motor cables not connected at both ends (cables must be
meggered before connection, drive optional - recommended in case of
long storage time, humid environment or visible transportation
damages)
(Electrical
installation)
installation), appropriately labeled,
Electrical