Installing The Flue System; Flue System Approvals - Heat-N-Glo TIARA I-CE Installer's Manual

Table of Contents

Advertisement

Step 2
Installing the
Flue System
COMPONENT IDENTIFICATION
TERMINATION KITS
SLK-TVCD
SLK-01D
SLK-991DA
Figure 4.
Flue Components and Terminations
A. Flue System Approvals
This model is approved for 4”/6 5/8” SL D-Series
flue pipe components and terminations. See Figures 4
and 5. Figures 6 through 9 show the vent systems
approved for use with these models. Approved flue
systems components are labeled for identification.
NO OTHER FLUE SYSTEMS OR COMPONENTS
MAY BE USED. Detailed installation instructions are
included with each flue termination kit and should be
used in conjunction with this manual.
WARNING
!
A minimum .915 m length of straight flue
pipe MUST be attached to the unit’s
starting collars for all flue systems.
Identifying Flue Components
The flue systems installed on this gas stove may
include one, two, or three 90° elbow assemblies. The
relationships of vertical rise to horizontal run in flue
configurations using 90° elbows MUST BE strictly
adhered to. The rise to run relationships are shown in
the flue drawings and tables. Refer to the diagrams
on the next several pages.
HORIZONTAL
TERMINATION
WALL FIRESTOP
90 DEGREE
ELBOW
SLK-01TRD
VERTICAL
TERMINATION
STORM COLLAR
ROOF FLASHING
HORIZONTAL PIPE
SUPPORT
PIPE LENGTH
CEILING
WALL BRACKET
FIRESTOP
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tiara ii-ce

Table of Contents