CAUTION
28
WARNING
!
FOLLOW NATIONAL REGULATIONS
AND CODES OF PRACTICE FOR
MINIMUM CLEARANCES FROM GAS
TERMINALS, AND PLACEMENT OF GAS
TERMINAL.
IF EXTERIOR WALLS ARE FINISHED WITH
VINYL SIDING, IT IS NECESSARY TO INSTALL
THE VINYL PROTECTOR KIT (VPK-DV) TO THE
TOP OF THE EXTERIOR FIRESTOP (FOR ALL
ROUND TERMINATION CAPS).
For Vertical Terminations - To locate the flue and
install the flue sections:
• Locate and mark the flue centerpoint on the
underside of the roof, and drive a nail through the
centerpoint.
• Make the outline of the roof hole around the
centerpoint nail.
• The size of the roof hole framing dimensions
depend on the pitch of the roof. There MUST BE
a 25.4 mm clearance from the vertical flue pipe to
combustible materials.
• Mark the roof hole accordingly.
• Cover the opening of the installed flue pipes.
• Cut and frame the roof hole.
• Use framing lumber the same size as the roof
rafters and install the frame securely. Flashing
anchored to the frame must withstand heavy
winds.
• Continue to install concentric flue sections up
through the roof hole (for inside flue installations)
or up past the roof line until you reach the appro-
priate distance above the roof (for outside termi-
nations).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tiara ii-ce

Table of Contents