Heat-N-Glo TIARA I-CE Installer's Manual page 18

Table of Contents

Advertisement

1. Apply the stove
cement.
2. Line up the internal
beads and rotate the
pipe sections clock-
wise until locked.
3. Lock the flue compo-
nents into place.
22
FIRST
VENT
COMPONENT
25.4 mm
STOVE SEALANT
BEAD 9.5mm
Figure 12. Attaching the First Flue Component to
the Starting Collars
!
WARNING
A 9.5 mm BEAD OF STOVE CEMENT
MUST BE PLACED AROUND THE
127 mm STOVE STARTING COLLAR
BEFORE ATTACHING THE FIRST FLUE
COMPONENT. FAILURE TO SEAL THIS
JOINT MAY CAUSE THE STOVE TO
OPERATE IMPROPERLY. SEE THE
DIAGRAM .
2. Continue Adding Flue Components
To continue adding flue components in accordance
with the pre-planned flue system configuration:
• Ensure that each succeeding flue component is
securely fitted and locked into the preceding
component in the flue system.
90° elbows may be installed and rotated to any point
around the preceding component’s vertical axis. If an
elbow does not end up in a locked position with the
preceding component, attach with a minimum of
three (3) sheet metal screws.
STARTING
COLLAR