5) Remove cable guide tabs from the underside of each end of Crossbeam, using a hex head screwdriver,
Fig. 6. Set Cable Guide Tabs & hardware aside for reassembly in the follwing steps.
6) Slide the cables from the ends of power-side runway and route the cables though the crossbeams
referring to the routing diagram in Fig 7.
REAR
CAUTION! Ensure the Cables are not twisted during routing and routed on the correct pulleys
in Runways.
Fig. 6
REAR VIEW
Fig 7
11
FP14KC-X
JAN 2023
Cable Guide
Tab
(Underside)
FRONT
FRONT VIEW