Step 2: Runways & Crossbeams Installations
NOTE: Lifting Cables & Pulleys are conveniently pre-assembled in Main Side Runway. As a
result, the Runways will need to be elevated off floor a few inches allowing access to underside
of Main Side Runway to access Cable Ends, Air Tubing, Hydraulic Hose, and Cylinder.
1) Position each runway in the predetermined location, making sure the jack rails on each runway are
installed to the inside. Be aware of the specific location of the Main Side 'power' Runway, making sure
the hydraulic hose connection is positioned to the front of bay. Fig 4.
2) Pull cable ends, air tubing and hydraulic lines out from the ends of the Main Side Runway for assembly.
Ensure cables are in the proper sheave grooves, Fig. 5.
3) Place the Front & Fear Crossbeams at each ends of runways, as shown in Fig 4.
CAUTION! Ensure openings in the sides of the Front & Rear Crossbeams are aligned with the
Cable Sheaves at each end of the Main Side Runway.
4) With the front & rear crossbeams openings aligned with the cable sheaves at each end of the main side
runway ends, carefully raise the cross beams to gain access to the underside of each end.
Hydraulic
Hose / Port
Main Side
Runway
REAR
Fig. 4
Fig. 5
10
FP14KC-X
JAN 2023
FRONT