Project EV EVA-07S-S User Manual page 45

Single phase ac charger
Hide thumbs Also See for EVA-07S-S:
Table of Contents

Advertisement

Installer Miles
Load Management Setup
Key Points to remember for the Load Management Setup
- Make sure the charger output is correct.
- Make sure load management is set to CT clamp when a CT clamp is installed.
- Turn off load management if no CT clamp or meter is present. Note: the charger output
will be six amps if the setting is set to CT clamp and no CT clamp is installed.
- If you set the Load Management to 'Meter', ensure the correct meter address is entered.
44