2. Physical installation
When the meter has been digitally configured into your Lora network it is time to physically activate and
install it. Prior to the installation of the IWM-LR3 - IWM-LR4 unit on the meter, remember to remove the
protective metal sticker from the module.
You can then proceed with the module mounting on the meter.
Physical installation process
.
Phase 1
Mount IWM-LR3 - IWM-LR4 unit on the water meter
IWM-LR3
module
+
CPR-M3-I
meter
IWM-LR3
module
+
GMDM-I
GMB-RP-I
GMB-I
meter
IWM-LR4
module
+
WDE-K50
meter
IWM-LR3 - IWM-LR4
Step 1
Step 1
Step 1
Step 2
Step 2
Step 2
4
CLICK!
Step 3
CLICK!
Step 3
Step 3