HYDROCAL-M4 •
1. Introduction
The HYDROCAL-M4 is a compact thermal energy meter that measures the energy consumption of
heating and cooling systems.
The meter allows to measure the thermal energy passing into a hydraulic circuit used for heating
EN
and\or for cooling, it also lets the acquisition through external module, of the volume measured by
up to 2 device (water, heat, gas, electricity, HCA) equipped with pulse emitter. The meter can also
be connected to a consumption reading network based on the wired M-BUS, Wireless M-BUS and
LoraWan network protocols.
The first configuration chosen during installation (supply or return pipe) can't be modified!
The top calculation/electronic unit must not be separated from the bottom brass case.
This meter contains potentially dangerous batteries, handle them with caution and do not disperse the
components in the environment.
The installation must be carried out by qualified personnel only. The manufacturer doesn't assume any
responsibility for improper installation or damages caused by third parties.
STORAGE CONDITIONS
The product must be stored in a dry place at temperatures between -20 °C and +70 °C (even during
transport). The duration of the storage should not exceed 1 year.
Combined heating or cooling meters are precision devices and must be protected from shock and
vibration.
GENERAL INFORMATION
• Before proceeding with the installation and configuration of the product, carefully read
the instructions in this manual.
For further technical clarification, please contact Customer Service.
• Installation should be carried out exclusively by qualified personnel.
• The reference standard for the instrument is EN 1434 (1-6) and Directive 2014/32/EC (Annex
MI-004).
• Any tampering of the meter or removal of the seals will void the warranty provided.
• For proper energy accounting, always respect the mounting type prescribed (inlet pipe installation/
return pipe installation).
• The configuration of installation version and unit of measurement can be done with
the buttons or an Android device with NFC connectivity.
• Respect the installation point (input or output) of the instrument.
PACKAGING CONTENT: HYDROCAL-M4 device, installation manual, antifraud kit
31.08.2022
v1.1
Operating and Installation Instruction
Subject to change without prior notice
WARNING
1

Advertisement

Table of Contents
loading

Summary of Contents for B meters HYDROCAL-M4

  • Page 1 Operating and Installation Instruction 1. Introduction The HYDROCAL-M4 is a compact thermal energy meter that measures the energy consumption of heating and cooling systems. The meter allows to measure the thermal energy passing into a hydraulic circuit used for heating and\or for cooling, it also lets the acquisition through external module, of the volume measured by up to 2 device (water, heat, gas, electricity, HCA) equipped with pulse emitter.
  • Page 2: Safety Information

    2. Safety Information Attention: this symbol highlights the instructions to be followed scrupulously for the correct functioning of the combined heat and cooling meter. Danger: the chapters marked with this symbol contain information that must be followed carefully to avoid dangerous situations. Thermal energy meters are precision devices and must be protected from shock and vibration.
  • Page 3 Pay attention to the angular or sharp protrusions in the threads, flanges and measuring tube. Therefore, it is recommended to wear protective gloves. The device shall be used in such a way as to minimize the potential for human contact during normal operation.
  • Page 4: Troubleshooting

    Mount only the newly supplied gaskets (gaskets should not get in the pipeline). Seals provided on site must be fit for purpose and comply with local guidelines and directives. B METERS disclaim all liability for consequential damage resulting from the use of third-party gaskets, such as corrosion of sealing surfaces and threads.
  • Page 5: Before Installation

    3. Installation BEFORE INSTALLATION Before the thermal energy meter installation make sure that the two ends of the inlet and outlet pipe are perfectly aligned, clean them with the utmost care. Moreover, make sure there is a suitable filter placed at the inlet and that clean and undamaged gaskets are inserted on both sides. The thermal energy meters must be installed as specified by the CEN-TR 13582 regulation.
  • Page 6: Temperature Sensor Installation

    The temperature sensor must be sealed when the installation is complete. 4. Functionality The HYDROCAL-M4 is equipped with dedicated sections for the measurement of thermal energy of a heating/cooling circuit and the volume measurement given by the domestic hot and cold-water meters.
  • Page 7: Display And Buttons

    In residential systems, usually with two pipes systems, the measurement of thermal energy takes place on a single section both in heating and cooling cycle. The picture below reports a typical connection diagram (installation on return pipe): 5. Display and buttons The device is equipped at the front with an LCD and two buttons (T1 and T2), useful for device initialization and readings 1) Eight-digit numeric field;...
  • Page 8 6. Commissioning Premise: before a functional tests, the procedures indicated in this paragraph must be performed for completing the physical installation phases including the connections. The device is delivered in sleep mode and it must be configured if not requested during the order. The first configuration chosen during installation (supply or return pipe) can’t be modified! Long press T2 button...
  • Page 9: Procedure For Commissioning

    PROCEDURE FOR COMMISSIONING 1) Check that the mounting position of the thermal energy meter and all electrical wiring are carried out correctly 2) Check if the device is configured, otherwise set the installation version and the unit of measurement 3) Check at level 3 that all configured parameters are correct (heating and cooling data) 4) Check that the thermal energy meter, pulse devices, probes etc.
  • Page 10 INDEX INDEX 3.01 SERIAL NUMBER 4.01 MEMORY DAY 1 3.02 CRC FW 4.01.1 HEAT J,MJ,GJ,kWh,MWh 3.03 MAIN FW 4.01.2 COOL J,MJ,GJ,kWh,MWh 3.04 RADIO FW 4.01.3 IN 1 Type of pulse 3.05 DISPLAY FW 4.01.4 IN 2 Type of pulse 3.06 INSTALL TYPE RETURN, SUPPLY 4.02...
  • Page 11: Errors And Faults

    8. Operating mode – Radio activation This section describes the radio communication management implemented. The WMBUS or LoRaWAN radio will activate after the passage of ±5 litres. Pre-configured radio parameters (WMBus): AMR, 200s , everyday from 0 to 24h, encryption disabled, no historical data, standard package (standard data (heating energy, heating volume, errors, battery value as a percentage).
  • Page 12 Error Name Description Return Measurement out Measurement of the return probe over the measuring range. of range Delta T The error occurs when for 24 continuous hours without flow and Delta T non-compliant (temperature difference) > 10°C. The error is triggered when the energy digits, based on the selected unit, Display Overflow go further the maximum possible display.
  • Page 13: Technical Data

    Do not expose the battery to an extremely low Always use original spare parts authorized by the pressure environment which could cause an manufacturer; explosion or a leak of gases or flammable liquids; 11. Technical Data Model Hydrocal M4 Heating: ΔΘ≥1K (counting enabling Counting operating conditions) Power supply...
  • Page 14 The abandonment of the equipment in the environment or the abusive disposal of the same are punishable by law. B METERS srl For the complete manual, E-mail (sales/info): info@bmeters.com Via Friuli, 3 •...

Table of Contents