ROLEC BasicCharge ROLEC0211B Installation & Operation Manual page 34

Intelligent ev charging pedestal
Table of Contents

Advertisement

Maintenance
7. Make sure the top cover is clean and free of debris. Pay particular attention to
the rubber seal that runs around the inside edge of the cover.
8. Place the top cover onto the light diffuser.
Make sure the top of the diffuser sits cleanly and squarely against the rubber
seal in the top cover.
9. Secure the top cover to the lighting head with the bolt and sealing washer
removed at start of the upgrade process.
Make sure the rubber side of the washer sits against the top of the cover.
10. Turn ON electrical power to the chargepoint.
BasicCharge Intelligent EV Charging Pedestal
Page 33 of 36
EVBM-V01-R1 Installation and Operation Manual
December 2022

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BasicCharge ROLEC0211B and is the answer not in the manual?

Questions and answers

Raymond
February 4, 2025

What size is the mains cables most likely 10mm and overcurrent device size and type of cable for load management. Will have to mount an external isolator as per IS10101

User image 67a26a9631f91

Table of Contents

Save PDF