HUCK Seiltechnik ABlar 4634-1 Assembly Instruction Manual

Oak post with steel safety lugs

Advertisement

Quick Links

Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany
seiltechnik@huck.net • www.huck.net
A Assembly instruction
Adlerhorst "Aßlar" without slide, Art. 4634-1
(Oak post with steel safety lugs, ø 20 cm)
\\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche
+Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc
- 1 -

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ABlar 4634-1 and is the answer not in the manual?

Questions and answers

Summary of Contents for HUCK Seiltechnik ABlar 4634-1

  • Page 1: A Assembly Instruction Adlerhorst "Aßlar" Without Slide, Art. 4634-1 (Oak Post With Steel Safety Lugs, Ø 20 Cm)

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net A Assembly instruction Adlerhorst “Aßlar” without slide, Art. 4634-1 (Oak post with steel safety lugs, ø 20 cm) \\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc - 1 -...
  • Page 2 Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Revision history Revision 0 – 2004-10-13 The first allowed version Assembly instruction Revision 2– 2011-04-07 Sicherheitsbereich FH All rights rewerved © Copyright 2003 Huck Seiltechnik GmbH -\\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc...
  • Page 3: Table Of Contents

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Contents Assembly instruction Adlerhorst “Aßlar” without slide, Art. 4634-1 (Oak post with steel safety lugs, ø 20 cm) ................... 1 Introduction Assembling ....................... 4 Datasheet Adlerhorst “Aßlar” without slide, article 4634-1 ............5 Delivery contents (parts list with part numbers) .................
  • Page 4: Introduction Assembling

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 1 Introduction Assembling General information This equipment should be installed, inspected, maintained and operated in ac- cordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see Tables 3-1 and 3-2).
  • Page 5: Datasheet Adlerhorst "Aßlar" Without Slide, Article 4634-1

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Datasheet Adlerhorst “Aßlar” without slide, article 4634-1 Space requirement: 1.90 m x 2.55 m and/or 4.55 m x 4.85 m including safety zone, height of fall 1.00 m Required safety surface:...
  • Page 6: Delivery Contents (Parts List With Part Numbers)

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Delivery contents (parts list with part numbers) In words Table 3-1: Delivery contents, in words Pos. Quantity Element / Size O.K. Missing Description Oak post with safety lugs (pre- Ø...
  • Page 7: Table 3-2: Delivery Contents, In Symbols

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net In symbols Table 3-2: Delivery contents, in symbols Pos. Quantity Symbol \\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc - 7 -...
  • Page 8: Erection Instructions

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Erection instructions -\\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc...
  • Page 9 Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Screw locking device ! glue all screws, nuts and sleeves with loctite. (except for lock nut) \\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc - 9 -...
  • Page 10 Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net - 10 -\\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc...
  • Page 11 Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net \\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc - 11 -...
  • Page 12 Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net - 12 -\\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc...
  • Page 13 Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net \\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc - 13 -...
  • Page 14 Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Version: Adlerhorst „Asslar“ without slide Setting time at least 7-8 days Climbing ladder Climbing net Adjust upon installation Concrete C25/30 (for foundations) Screw-in anchor Fall protection Foundation radius at least 10 cm...
  • Page 15: Post Installation Checks

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Post installation checks If the equipment has not been installed safely, you must ensure that the public is prevented from using it. Marking filler depth • Labelling the posts to show the depth of material provided as fall protection (i.e.
  • Page 17: B Maintenance Instructions Adlerhorst "Aßlar" Without Slide, Art. 4634-1 (Oak Post With Steel Safety Lugs, Ø 20 Cm)

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net B Maintenance instructions Adlerhorst “Aßlar” without slide, Art. 4634-1 (Oak post with steel safety lugs, ø 20 cm) \\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc - 17 -...
  • Page 18 Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Revision history Revision 0 – 2004-10.13 The first allowed version Maiantanance instruction Revision 2 – 2011-04-07 Sicherheitsbereich All rights reserved © Copyright 2003 Huck Seiltechnik GmbH - 18 -\\CAD1\Huck-SG_Mont-Anl\Huck-Mont\Englisch\4634-01\Eiche +Rutsche\Adlerhorst_asslar_4634_01_ohne_Rutsche_EI_B_L_1_GBR.doc...
  • Page 19: Introduction Maintenance

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Introduction Maintenance General informations This equipment should be installed, inspected, maintained and operated in ac- cordance with EN 1176-7 guidelines. Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
  • Page 20: General Maintenance Information

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net General maintenance information Maintenance intervals Maintenance intervals are based on average use. Please note that more fre- quent inspections and/or maintenance are required if the play equipment is subject to intensive use.
  • Page 21: Specific Maintenance Advice

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 7.10 Faults Faults must be repaired as soon as they are detected. If serious defects that compromise safety cannot be repaired straight away, the public must be prevented from using the equipment with immediate effect.
  • Page 22: Maintenance Timetable

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Maintenance timetable Special advices 9.1.1 Maintenance interval We strongly advise you to carry out inspections and maintenance work within the specified periods as use of the equipment, the weather and malicious van- dalism cause wear and tear that compromises the safety and function of the equipment.
  • Page 23: Monthly Maintenance

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 10 Monthly maintenance • Check the spaces between the equipment and the ground (clearance and height of fall). • Check the ground surface in the area with fall protection for hard objects and loose foundations.
  • Page 24: Annual Maintenance

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net Annual Maintenance 12 Annual maintenance • Ascertaining that the equipment, foundations and surfaces are safe for op- eration. • In particular, the equipment should be checked for decay and corrosion. It may be necessary to dig out or excavate certain components in order to do so.
  • Page 25: Maintenance Printout

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 13 Maintenance printout Name of item: Adlerhorst “´Aßlar” without slide / Art. No. 4634-1 Location: _______________________________________________________________________________________ Customer or operator: _____________________________________________________________________________ (Town, Town council, Kindergarten) Date of Inspector O.K. Accessible...
  • Page 27: Hand Over Document

    Huck Seiltechnik GmbH • 35614 Aßlar/Berghausen • Germany seiltechnik@huck.net • www.huck.net 14 Hand over document After the installation of the equipment pass the installation and mainte- nance documents to the operator. The operator has to receive the hand over documents. The complete filled and signed hand over document should be sent to the supplier.

Table of Contents