Installation Of Charge Junction/Gauge Connection Of Road Compressor - Zanotti Zero Series Installation Manual

Table of Contents

Advertisement

Refrigeration unit
Series Zero Direct-Drive
Z200 | Z250 | Z350 | Z380
Z380 Multi

3.8.3 Installation of charge junction/gauge connection of road compressor

1
Suction line junction (S)
Road
compressor
S
Ø 16 mm [0.63 in ]
Install the connections (1, Figure 58) and (2) respectively on the suction and supply lines of the
road compressor.
NOTE
Provide a syphon for the oil and connect the suction pipe to the connector of the
compressor marked with the letter "S". Pour the remaining refrigerant oil into the suction
pipe.
rev.01
INSTALLATION MANUAL
Figure 58 - road compressor installation
2
suction
line
D
Supply line junction (D)
Road compressor supply line Ø 10 mm [0.39 in]
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z200Z250Z350Z380 z380 multi

Table of Contents