TLV320AIC32EVM and TLV320AIC32EVM-PDK User's
This user's guide describes the characteristics, operation, and use of the
TLV320AIC32EVM, both by itself and as part of the TLV320AIC32EVM-PDK. This
evaluation module (EVM) is a complete stereo audio codec with several inputs and
outputs, extensive audio routing, mixing and effects capabilities. A complete circuit
description, schematic diagram and bill of materials are also included.
The following related documents are available through the Texas Instruments web site
at www.ti.com.
1
EVM Overview
2
3
4
5
6
7
1
2
Default Software Screen
3
4
5
6
7
2
2
I
S, I
C are trademarks of Koninklijke Philips Electronics N.V.
Windows is a trademark of Microsoft Corporation.
SPI is a trademark of Motorola, Inc.
LabView is a trademark of National Instruments.
All trademarks are the property of their respective owners.
SBAU113 - November 2005
EVM-Compatible Device Data Sheets
Device
TLV320AIC32
TAS1020B
REG1117-3.3
TPS767D318
SN74LVC125A
SN74LVC1G125
SN74LVC1G07
...............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
...............................................................................................................
.................................................................................................................
.......................................................................................................
..................................................................................
......................................................................................
..................................................................................................
..................................................................................................
...................................................................................................
............................................................................................................
.......................................................................................................
.................................................................................................................
Literature Number
SLAS479
SLES025
SBVS001
SLVS209
SCAS290
SCES223
SCES296
Contents
List of Figures
.................................................................................
TLV320AIC32EVM and TLV320AIC32EVM-PDK User's Guide
User's Guide
SBAU113 - November 2005
Guide
36
40
41
10
12
13
14
16
17
2
3
4
5
6
7
8
1
Need help?
Do you have a question about the TLV320AIC32EVM and is the answer not in the manual?
Questions and answers