Advertisement

Quick Links

www.ti.com
User's Guide
TLV3605EVM User's Guide
The TLV3605EVM is an evaluation board designed to evaluate the high-speed TLV3605 comparator. The
TLV3605EVM has layout options intended to make it simple to evaluate timing performance with different
measurement tools. The output of the TLV3605 is designed for low-voltage differential signals (LVDS), that
provide high-speed signals to interconnect devices such as FPGAs with minimal power dissipation.
1
Introduction.............................................................................................................................................................................2
2
Features...................................................................................................................................................................................3
Specifications.................................................................................................................................................................4
Equipment.....................................................................................................................................................5
Setup.............................................................................................................................................................................9
6.1 Supply Voltage...................................................................................................................................................................
6.2 Inputs.................................................................................................................................................................................
6.3
Outputs.............................................................................................................................................................................10
Guidelines.................................................................................................................................................................12
8
Schematic..............................................................................................................................................................................14
9 Bill of Materials.....................................................................................................................................................................
Figure 1-1. TLV3605EVM Board Top View..................................................................................................................................
Figure 2-1. Block Diagram...........................................................................................................................................................
Figure 5-1. TLV3605 EVM Prop. Delay with Latch Setup............................................................................................................
Example..................................................................................................................................................8
Figure 6-1. TLV3605EVM Supply Voltage Connection................................................................................................................
Figure 6-2. Input Side Schematic..............................................................................................................................................
Figure 6-3. Output Side
Schematic............................................................................................................................................10
Layers......................................................................................................................................................................12
Figure 7-2. Block Diagram.........................................................................................................................................................
Figure 8-1. TLV3605 EVM
Schematic........................................................................................................................................14
BOM..........................................................................................................................................................................15
Trademarks
All trademarks are the property of their respective owners.
SNOU182 - FEBRUARY 2021
Submit Document Feedback
ABSTRACT

Table of Contents

List of Figures
Assignments.................................................................................................................................4
TLV3605EVM.........................................................................................................................11
List of Tables
Copyright © 2021 Texas Instruments Incorporated
Latch.............................................................................................6
Table of Contents
9
9
15
2
3
7
9
10
13
TLV3605EVM User's Guide
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TLV3605EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TLV3605EVM

  • Page 1: Table Of Contents

    The TLV3605EVM is an evaluation board designed to evaluate the high-speed TLV3605 comparator. The TLV3605EVM has layout options intended to make it simple to evaluate timing performance with different measurement tools. The output of the TLV3605 is designed for low-voltage differential signals (LVDS), that provide high-speed signals to interconnect devices such as FPGAs with minimal power dissipation.
  • Page 2: Introduction

    The TLV3605EVM is an evaluation board designed to evaluate the high-speed TLV3605 comparator. The TLV3605EVM has layout options intended to make it simple to evaluate timing performance with different measurement tools. The output of the TLV3605 is designed for low-voltage differential signals (LVDS), which provide high-speed signals to interconnect devices such as FPGAs with minimal power dissipation.
  • Page 3: Features

    • RVK Package 12-Pin QFN SHDN_SENSE IN+_SENSE ¤ 0.1uF OUT+ ¡ ¢ – 0.1uF OUT- £ IN-_SENSE LE_SENSE SHDN LE/HYST Figure 2-1. Block Diagram SNOU182 – FEBRUARY 2021 TLV3605EVM User’s Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 4: Evm Specifications

    – 0.1uF Pin 10 (OUT-) Pins 3, 5, 9, 11 (V IN-_SENSE LE_SENSE Pin 7 (SHDN) Pin 8 (LE/HYST) Figure 3-1. TLV3605EVM Pin Assignments TLV3605EVM User’s Guide SNOU182 – FEBRUARY 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 5: Recommended Equipment

    – All forced input voltages and signals must have matched cable lengths. • IN+, IN-, SHUTDOWN, LE/HYST – All sensed voltages and signals • LE/HYST SENSE, IN+SENSE, IN-SENSE, SHUTDOWN SENSE, OUT+, and OUT- SNOU182 – FEBRUARY 2021 TLV3605EVM User’s Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 6: How To Make A Propagation Delay Measurement With Latch

    10.Enable the IN- power supply. 11. Enable the signal generator. 12.Monitor and verify the inputs from IN+SENSE and IN-SENSE 13.Monitor and verify the outputs for OUT+ and OUT- TLV3605EVM User’s Guide SNOU182 – FEBRUARY 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 7: Figure 5-1. Tlv3605 Evm Prop. Delay With Latch Setup

    LEB/HYST 50% rising edge (disable latch), and when OUT (differential) reaches 50% of expected value (LOW). The propagation delay after latching was measured at 2.709ns with the setup described. SNOU182 – FEBRUARY 2021 TLV3605EVM User’s Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 8: Figure 5-2. Quick Start Example

    Channel 1: IN+ 100mVpp @ 300mV DC Offset 50MHz Channel 3: OUTP – OUTN, Differential Output of TLV3605 using Differential Probe Figure 5-2. Quick Start Example TLV3605EVM User’s Guide SNOU182 – FEBRUARY 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 9: Board Setup

    Board Setup 6 Board Setup 6.1 Supply Voltage The TLV3605EVM operates from +2.4 V to +5.5 V. Connect VCCI and VEE using TP1 and TP3 respectively. Alternatively, J10 can also be used. Figure 6-1. TLV3605EVM Supply Voltage Connection 6.2 Inputs Resistors R8, R7, R11, and R12 are all 0 ohm resistors.
  • Page 10: Outputs

    Figure 6-2. Input Side Schematic The TLV3605EVM has an optional resistor pad between the device inputs meant for a 100 Ω resistor. This resistor is only needed if applying an unterminated LVDS signal to the board, otherwise it can be left uninstalled.
  • Page 11: Figure 6-4. Differential Output Of Tlv3605Evm

    Board Setup Figure 6-4. Differential Output of TLV3605EVM SNOU182 – FEBRUARY 2021 TLV3605EVM User’s Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 12: Layout Guidelines

    Layout Guidelines www.ti.com 7 Layout Guidelines Figure 7-1. Layers TLV3605EVM User’s Guide SNOU182 – FEBRUARY 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 13: Figure 7-2. Block Diagram

    Layout Guidelines SHDN_SENSE IN+_SENSE ¤ 0.1uF OUT+ ¡ ¢ – 0.1uF OUT- £ IN-_SENSE LE_SENSE SHDN LE/HYST Figure 7-2. Block Diagram SNOU182 – FEBRUARY 2021 TLV3605EVM User’s Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 14: Schematic

    Schematic www.ti.com 8 Schematic Figure 8-1. TLV3605 EVM Schematic TLV3605EVM User’s Guide SNOU182 – FEBRUARY 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 15: Bill Of Materials

    Black Open Top 0.100" (2.54mm) GoldHORTING .100 " GOLD R7, R8, R11, RES, 0, 0%, 0.2 W, 0402 CRCW04020000Z0EDHP Vishay-Dale R12, R14 AEC-Q200 Grade 0, 0402 SNOU182 – FEBRUARY 2021 TLV3605EVM User’s Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 16: Schematic

    Texas Instruments Texas Instruments Comparator with LVDS Outputs, RVK0012A (QFN-12) R9, R10 RES, 100, 0.1%, 0.1 0402 MCS0402MD1000BE100 Vishay/Beyschlag W, AEC-Q200 Grade 0, 0402 TLV3605EVM User’s Guide SNOU182 – FEBRUARY 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 17 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 18 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 19 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 20 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 21 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 22 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products.IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2021, Texas Instruments Incorporated...

Table of Contents