Emerson Micro Motion GDM Installation Manual page 21

Table of Contents

Advertisement

Figure 2-1:
A.
B.
C.
D.
E.
Procedure
1.
2.
3.
4.
5.
6.
Installation Manual
Meter installation pieces
M8 socket-head cap screw (for mounting)
Meter housing
Aluminum sleeve (cylinder)
Anti-vibration gasket
Thermo-well pocket
(Recommended) Install the thermo-well pocket in the aperture created in the
pipeline and weld it into place.
Pour the supplied silicon fluid (an amount of 20 cm
Place one 5-mm anti-vibration gasket on top of the pocket.
Align the anti-vibration gasket holes with the bolt holes on the pocket.
Place the aluminum sleeve over the end of the meter housing.
Insert the meter housing into the pocket.
Secure the meter into place, using the supplied mounting screws.
STATUS
A
SCROLL
SELECT
B
C
E
3
) into the interior of the pocket.
Mounting
D
17

Advertisement

Table of Contents
loading

Table of Contents